And have been since Thursday. On Thursday night, we moved our beds from the basement and on Friday morning, we moved all the rest of our "stuff". I've been furiously unpacking ever since. I'd say I'm 80% done. As soon as the house is in some sort of order, I'll shoot some pictures. We have lots of people returning on Tuesday for touch up work. I can't wait to be completely settled, but the house is extremely comfortable.
Saturday, August 30, 2008
Wednesday, August 27, 2008
The cleaners are here!
They are still working on lots of little details, but the cleaners arrived today to begin getting the house ready for "us". The painters where there touching up trim and drywall. Our backsplash was grouted and our range was installed
Our wine fridge had also been installed. I can't wait to fill it up!
The door hardware on the main floor was on. We used chrome in the bathrooms
and antique brass everywhere else
The window washers had been there and all the exterior windows were clean, in addition to the windows leading into my office
The front door was also on
We may actually start to move some furniture up to the upper levels tomorrow!
Tuesday, August 26, 2008
Floors, Kitchen backsplash and plumbing
The last coat of poly went on the floors last night, so there was lots of action finishing things up at the house today.
The tilers were back and installed the kitchen backsplash and the remaining tile in the master bathroom. Both of these projects required the counter tops be in.
I'm pleased and relieved with the way the kitchen backsplash turned out. I redesigned this no fewer than five times in the last two weeks. Here is the section on the range wall
And here is the section I added with extra tile in the nook
The master bathroom tile was also complete and both areas should be grouted tonight.
Our range had moved as far as the nook. I'm expecting it will land in its final "home" soon. This is the 36" 6 burner Blue Star range.
There were lots of plumbing fixtures in as well. They included...
the powder room
the boys' bath
the guest bath
and the kitchen
The shower and shower/tub fixtures were installed. These are not the fixtures we ordered, but they were roughed in wrong. The fixtures were supposed to have porcelain accents and match the sink faucets, but I'm sure I'll forget this soon.
The pedestal sinks were almost done
And the claw foot tub was completed
All in all, an outstanding day! The doors were also all hung and the door hardware was going on. They should be very busy for the next two days finishing everything up, but we hope to be moving in on Friday!
Saturday, August 23, 2008
Kitchen Faucet
Friday, August 22, 2008
Floors are being finished (and lots more action)
There seems to be a lot going on at the house today. The first coat of poly went on the main floor yesterday (there are already two on the upper floors). The holes for the faucet was done on the island today. The plumber is installing the plumbing fixtures. The front door was hung and the interior doors are hung. Hardware is being installed in the house. It is very exciting to see everything come together. We are aiming to be in next week sometime.
Here are the floors in the great room,
the dining room
and the master bedroom
The mirror in the powder room, patiently waiting to be installed.
and a sneak preview of our door knobs
Tuesday, August 19, 2008
I oiled the soapstone!
I couldn't help myself. I had to see what it looked like. The island has some great movement in it and I'm very happy with the seam.
Here is the stone to the right of the range.
The stone to the left of the range
Here is the seam in the island
And the island itself
The fireplace surround was also completed and I'm very happy with the result and grout color.
Finally, our BlueStar was partially unwrapped so I got a sneak peak at it.