There seems to be a lot going on at the house today. The first coat of poly went on the main floor yesterday (there are already two on the upper floors). The holes for the faucet was done on the island today. The plumber is installing the plumbing fixtures. The front door was hung and the interior doors are hung. Hardware is being installed in the house. It is very exciting to see everything come together. We are aiming to be in next week sometime.
Here are the floors in the great room,
the dining room
and the master bedroom
The mirror in the powder room, patiently waiting to be installed.
and a sneak preview of our door knobs
No comments:
Post a Comment