Monday, December 31, 2007

Construction Begins (and a little history)

I'm starting this blog a little late... We bought our lot in June of 2006 after much time planning. Here is our lot when we bought it.

Photobucket

We wanted to have our plans complete by July of 2006, but we ended up regrouping, ditching our first set of plans and starting over. We ended up modifying a plan by Alan Mascord. He has a lot of really great Craftsman plans which kept appealing to us. We got our final drawings from the architect in December of 2006.

Our front and rear elevations are below.

Front Dormers

Rear Dormers

The main floor plan has the garage, dining room, office, kitchen, nook, great room, master bed and bathroom, a powder room and the mud/laundry room.

Photobucket

The upper floor will initially just be finished with two bedrooms for the boys and a bathroom, but there is the potential to finish a bonus room, a fourth bedroom and second bathroom.

Photobucket

None of the lower level will initially be finished, but eventually it will hold the family room, guest bed and bathroom, a shop, wine cellar and extra storage.

Photobucket

In April of 2007, we dug our beach...

Beach

and then got cold feet and stalled. In Jully of 2007, we sold our home and moved into a rental, planning on waiting until Spring of 2008 to break ground. However, we broke down and decided to move forward ahead of schedule in the fall of 2007. On November 19th of 2007, we broke ground. The footing were poured in the snow the day before Thanksgiving on 11/21.

Pouring Footing in snow

The foundation were poured the next week and the forms were off by 11/28/2007.

Basement Walls

Then, the big delay (probably not the last). The framers were slow finishing the jobs in front of us because of the snow, so we were told they would be there, and be there, and be there, bu they weren't. Finally, a few days before Christmas, miscellaneous equipment and our building supplies began to arrive, but framing didn't begin in earnest until December 26th. Then, two crews showed up and by December 30th, they had framed in the basement and the entire first floor.

Here are some of my favorite features... This the fireplace in our great room. The frames on either side of it will hold two leaded glass windows salvaged from a Craftsman home built in 1919 in Detroit.

Photobucket

These windows are in our master bathroom. My clawfoot tub will sit in front of them.

Photobucket

This is the bank of windows in our master bedroom. We weren't planning on window treatments, but after seeing the size of the these windows, we may have to reconsider for modesty's sake.

Photobucket

We are really excited to see the stairs and the upper floor (with the boys' bedrooms) go on in the next few days.