Thursday, August 14, 2008

Plumbing finish work begins

The plumbers were back onsite today to begin installation of the plumbing fixtures. My tub was finally in its proper place and shutoff valves were being installed on all the water supply lines. I'm hopeful we will see some toilets and sinks tomorrow, along with our counter tops.

The cabinet in the powder room had been reinstalled post paint and tile.

Photobucket

Here is a picture of the Master bath as you enter from the bedroom. The tub is on the left, the two pedestal sinks will be straight ahead and the shower is on the right.

Photobucket

This is look from my tub towards the shower and master closet (in the rear) and the toliet closet to the right.

Photobucket

The electricians had also been back to relocate the outlet for the hood and the drywaller arrived as I was leaving to do some patch work.

Photobucket