The dock is complete and we have called the electrician to finish the job of getting an outlet the final couple of feet from the conduit on our beach to the lift. I think I will also have them pull cat5e at the same time and put it in a 1 gang weather proof box so I can add the audio and possibly a wireless access point at my leisure this summer. It was a bit of work to get the awning on since the water is freezing and we can't walk all the way around the boat, but I was able to get most of the grommets secured from within the boat.
No comments:
Post a Comment