Wednesday, February 13, 2008

Low Voltage Wiring 33% Done

It was a very cold night last night, but we worked from about 4 pm to 9 pm and got a little over 1/3 of the low voltage wiring pulled. We pulled all the wires in the upper level and figured out our routes for the lower two floors. Several large boxes should be arriving from Monoprice today with the remainder of our supplies. My goal tonight is to get at least all the CAT5E for the lower floors pulled and get a good start (if not all) of the speaker wiring pulled. If we accomplish that, we will be in good shape. We may wait until evening again to go out in the hopes that the HVAC people will finish their runs in the basement so we can avoid them.

No comments:

Post a Comment